# Current state
As of the latest research (mid/late 2026), neither Blue Moon MK1 nor uncrewed Starship has landed on the Moon. Blue Origin's MK1 pathfinder ("Endurance") was targeting a 2026 launch on New Glenn but New Glenn suffered a major upper-stage failure/pad explosion (NG-3, April 2026) grounding the vehicle; a backup MK1 unit (SN001/"CS-7") is now booked for late 2027. SpaceX's Starship V3 orbital/HLS demo program is progressing (Flights 12–13 flown, orbital flight targeted ~Q3 2026) but propellant transfer and an uncrewed lunar landing demo are not expected until ~mid-2027 per internal NASA/SpaceX documents. NASA has restructured Artemis III into a LEO docking demo (crewed lunar landing pushed to Artemis IV, 2028) and opened the lander contract to competition, favoring BO's simpler no-refueling MK1 architecture.
# Timeline of key events
- 2025-05: NASA selects Blue Origin's Mark 2 as second HLS provider (confirmed, background).
- 2025-10-20: NASA Acting Administrator Sean Duffy announces reopening of Artemis III lander competition, citing SpaceX delays (reported, SpaceNews/NASASpaceFlight).
- 2025-10-28: Blue Origin details lunar exploration progress; NASA reaches out to modify MK1 for potential human-rating (reported).
- 2025-11: Blue Origin states MK1 could fly "as soon as this year" (reported statement).
- 2025-11-13: New Glenn NG-2 achieves first successful booster landing (confirmed, Wikipedia).
- 2025-12: Blue Origin unveils Blue Moon MK1 lander publicly, targeting 2026 flight (reported, NASASpaceFlight).
- 2026 (Q1-Q2): Starship Flight 12 (Ship 39/Block 3, May 22, 2026) launches; booster fails boostback burn (confirmed).
- 2026-04-19/30: New Glenn NG-3 mission fails — upper-stage BE-3U underperformance, payload stranded in low orbit; pad explosion damages LC-36; FAA grounds New Glenn (confirmed, multiple sources).
- 2026-05: Blue Moon MK1 "Endurance" completes thermal vacuum testing at NASA JSC Chamber A (confirmed, NASA).
- 2026-06: Media coverage frames NG-3 failure as threatening Artemis timeline; NASA reaffirms 2027 Artemis III target despite setback (reported).
- 2026-06: Second MK1 unit (SN001/"CS-7") confirmed targeting late-2027 launch/landing (Wikipedia).
- 2026-06-09: NASA names Artemis III crew despite turmoil (confirmed).
- 2026-07-15/16: NASA details Artemis III LEO docking demo (Orion-Starship HLS docking, no lunar surface touch) replacing original crewed landing plan (confirmed, NASA.gov).
- 2026-07-24: Starship Flight 13 (V3 suborbital test) launches (confirmed).
- Late 2026 (reported): Internal NASA/SpaceX document shows schedule: propellant transfer June 2026, uncrewed lunar landing June 2027, crewed landing Sept 2028 (reported, Politico/Audrey Decker).
- 2026-07-26/31: NASA offers to support New Glenn testing to help recovery/Artemis schedule (confirmed).
# Event
Will Blue Origin land an uncrewed Blue Moon MK1 lander on the Moon before SpaceX lands an uncrewed Starship, both before Jan 1, 2030?
# Outcomes to forecast
- Yes (Blue Origin lands MK1 first, before 2030)
- No (SpaceX lands first, or neither lands by 2030)
# Kalshi market anchor
**Current YES price: 61%** (KXBLUESPACEX-30). 7-day change: -2%; 30-day change: +11% (likely reflecting NG-3 failure news partially offset by SpaceX's own slower propellant-transfer/HLS timeline). Price range over 89 days: 44%-73%. Average daily volume: 343 contracts — moderate liquidity.
# Sub-question answers
1. **Kalshi price/volume/90-day trend?** — 61% YES, up 11% over 30 days despite a -2% weekly dip; range 44-73% over 89 days, ~343 contracts/day avg [kalshi_direct].
2. **MK1 launch status?** — Not yet launched. Originally targeting 2026 on New Glenn NG-3, but NG-3 failed (April 2026) and grounded New Glenn; MK1-101 "Endurance" completed thermal-vac testing; backup unit (MK1-SN001/CS-7) now targets late 2027 [claude_news, Wikipedia].
3. **New Glenn cadence/lander precedent?** — Only 2 New Glenn flights to date (NG-1 success Jan 2025, NG-2 success w/ booster landing Nov 2025) before NG-3 failure (Apr 2026); first-gen CLPS landers have mixed record (Peregrine failed, IM-1/SLIM partial success, Blue Ghost/IM-2 successes reported elsewhere) — historical base rate for first attempts ~50-60% [wikipedia, claude_news].
4. **SpaceX Starship uncrewed HLS timeline?** — Internal NASA/SpaceX doc: propellant transfer June 2026, uncrewed lunar landing June 2027, crewed Sept 2028; V3 flights (12, 13) underway but booster/ship anomalies persist; orbital flight targeted Q3 2026 [claude_news].
5. **NASA contract restructuring?** — Yes: NASA reopened Artemis III lander competition (Oct 2025), restructured Artemis III as LEO docking demo (crewed landing moved to Artemis IV/2028), and is courting BO's simpler MK1 as a potential accelerant [claude_news, gdelt_news].
6. **Probability MK1 lands before 2030, conditional SpaceX beats it?** — Monte Carlo model: P(BO succeeds by 2030) ≈86%; P(SpaceX succeeds by 2030) ≈17-18%; P(YES, BO wins) ≈0.80-0.90, driven mainly by BO's attempt count/success rate, not SpaceX's risk [code_execution].
# Key facts (high-confidence, factual)
1. [kalshi_direct] Current YES = 61%, up from ~50% a month ago.
2. [claude_news/gdelt] New Glenn NG-3 failed April 2026, grounding the rocket and damaging LC-36.
3. [claude_news] Backup MK1 unit now targets late 2027 launch/landing.
4. [claude_news] SpaceX internal schedule shows uncrewed Starship lunar landing ~June 2027.
5. [NASA.gov] Artemis III restructured to LEO docking demo; crewed landing moved to Artemis IV (2028).
6. [Wikipedia] New Glenn has flown only 2 successful missions (NG-1, NG-2) before the NG-3 failure.
# Cross-market signals
- Kalshi related: "Starships dock together before 2028" at 67% (rising), "Starship Mars before 2030" at 14% — market skeptical of aggressive Starship milestones.
- Kalshi: "Next country to send humans to Moon — USA" at 54%, down slightly — reflects general Artemis schedule uncertainty.
- Polymarket: no matching markets found.
# Analyst opinions and speculation
- NASA officials (Duffy) publicly favor BO's simpler no-refueling MK1 as more likely to succeed first [claude_news].
- Media framing post-NG-3 explosion is bearish on BO near-term ("Blue Origin rocket explosion throws off future of Artemis") but NASA insists Artemis timeline intact [gdelt_news].
- Structural analysis: BO's architecture (no orbital refueling) is simpler than Starship's (multi-tanker refueling), giving BO a durable technical edge even amid setbacks [claude_news, code_execution].
# Directional lean per outcome
- **Yes (BO first):** Supported by simpler architecture, multiple planned attempts (2026, then 2027 backup), NASA favoritism, and model showing SpaceX's uncrewed demo is structurally later (mid-2027+) even under optimistic assumptions. Opposed by NG-3 failure introducing real schedule/reliability risk to BO's near-term cadence.
- **No (SpaceX first or neither):** Supported by NG-3 failure demonstrating New Glenn/MK1 execution risk; if BO suffers repeated failures, window narrows before 2030. Opposed by SpaceX's own compounding risk (propellant transfer unproven, V3 anomalies, 15-launch architecture per Gizmodo) making 2027+ uncrewed landing uncertain.
# Gaps / unknowns
- No confirmed rescheduled date for MK1's next launch attempt post-NG-3.
- Unclear whether NG-3 investigation findings will further delay New Glenn's return to flight.
- No Polymarket cross-check available.
- Exact number of feasible BO landing attempts before 2030 is model-assumed, not confirmed by BO.
# Calibration anchors
- Kalshi current YES price: 61% (anchor).
- Monte Carlo model point estimate: 80-90% (range 55-95% depending on BO attempt/success assumptions).
- Historical first-gen lander success rate ~50-60% per attempt (Peregrine failed, others partial/success).