# Current state
As of the market's latest data (~Aug/Sept 2026), the Army has selected 5 specific bases and vendors (Fort Bragg, Campbell, Hood, Benning, Drum) under the Janus Program and awarded up to $2.2B in contracts to build on-base microreactors (FY2027–FY2031 build/operate window), driven by EO 14299's Sept 30, 2028 statutory deadline. However, these are framed as general installation/grid-independence power, not explicitly "for a data center" — while separate, less-mature efforts (Fort Bliss AI data center, floating reactor concept) more directly pair reactors with AI compute on bases but remain unconfirmed/pre-contract. No NRC/DOE reactor authorization, EIS filing, or groundbreaking tied specifically to a data-center-linked reactor has yet occurred.
# Timeline of key events
- 2020 – Project Pele launched by DoD to build deployable microreactor for remote bases (confirmed, Wikipedia).
- 2022-06 – BWXT awarded $300M contract for Pele's 1.5 MWe prototype reactor (confirmed, BWXT/claude_news).
- 2025-05-23 – Trump signs EO 14299, directing Army-regulated reactor operational at a domestic base by Sept 30, 2028; mandates NEPA categorical exemptions; directs DOE to designate an AI data center for advanced reactor use within 90 days (confirmed, presidency.ucsb.edu).
- 2025-10 – Army formally launches Janus Program as executive agent for EO 14299 compliance (confirmed, army.mil).
- 2025-12-18 – FY2026 NDAA signed: Sec 318 creates DoD nuclear-deployment executive agent; Sec 319 establishes Advanced Nuclear Technologies Transition Working Group (≥3 pilot projects); Sec 321 creates 10-year Navy SMR pilot (confirmed, morganlewis.com).
- 2026-02 – Pentagon explores 300 MW floating reactor concept with UK's Core Power, targeting 2028 deployment, explicitly linked to AI compute support (reported, armyrecognition.com).
- 2026-04-19 – Air Force/DIU select Buckley AFB (CO) and Malmstrom AFB (MT) as potential reactor sites (confirmed, gazette.com).
- 2026-07-21 – Oklo and X-Energy join Trump admin's $200M DOE-led program to speed reactors for AI data centers (DOE/national labs track, not DoD-direct) (confirmed, Bloomberg).
- 2026-08-08 – Pentagon reported advancing AI data centers across military bases, with Fort Bliss as flagship; procurement requires off-grid power plan (reported, nuclear-news.net).
- 2026-08-26 – Army announces Janus Program awards: 5 bases/vendors, up to $2.2B combined, build/operate FY2027–FY2031; Army expects 20+ microreactors DoD-wide eventually (confirmed, Fox Business/The Hill/Washington Times).
# Event
Will the US start the process of building a nuclear-powered data center on a military base before 2030?
# Outcomes to forecast
Yes / No
# Kalshi market anchor
**Current YES price: 54%** (up +8pts over 7 days, +5pts over 30 days; range 30–63% over 47 data points; avg daily volume only 41 contracts — thin market). Price has trended upward, consistent with news flow (Janus awards, EO deadlines, Fort Bliss reports).
# Sub-question answers
1. **Kalshi price/volume history** — YES at 54%, rising steadily (+8% wk, +5% mo); low liquidity (~41 contracts/day) suggests moves are news-sensitive but not deeply informed. [kalshi_direct]
2. **DoD programs targeting reactors on bases** — Project Pele (BWXT, Idaho Nat'l Lab demo ~2028); Janus Program (5 bases: Bragg, Campbell, Hood, Benning, Drum; FY2027–31); Air Force/DIU site picks at Buckley and Malmstrom (Apr 2026); Navy SMR 10-yr pilot (NDAA Sec 321). [claude_news, gazette.com, morganlewis.com]
3. **Explicit data-center linkage** — EO 14299 explicitly calls for reactors for both military bases AND AI data centers, and directs DOE to designate an AI data center for advanced reactor use. Fort Bliss is reported as flagship AI data center site requiring off-grid power. Floating reactor concept explicitly cites AI compute support. But the 5 awarded Janus bases are framed as general installation power, not data-center-specific. [presidency.ucsb.edu, nuclear-news.net, armyrecognition.com]
4. **EO/NDAA deadlines** — EO 14299 (May 2025) sets Sept 30, 2028 deadline for Army-regulated reactor operational on a base; directs NEPA categorical exemptions. FY2026 NDAA (Dec 2025) codifies executive agent, working group, and Navy SMR pilot but sets no new hard "data center" deadline. [presidency.ucsb.edu, morganlewis.com]
5. **Concrete authorizations/filings** — As of Aug 2026: contracts awarded ($2.2B Janus, $300M Pele/BWXT), sites selected, but no NRC/DOE formal reactor authorization, EIS filing, or groundbreaking confirmed for any data-center-linked reactor specifically. [claude_news]
6. **Failure modes** — Analysts (Hogan Lovells) flag funding/appropriations risk (Congress unlikely to fully fund until 2026+), regulatory ambiguity (DOE alternative authorization vs. NRC), and general schedule slippage on "first-of-a-kind" reactor by 2028 as ambitious. HALEU fuel supply risk not directly addressed but is a known industry-wide bottleneck. [hoganlovells.com]
# Key facts (high-confidence, factual)
1. [presidency.ucsb.edu] EO 14299 mandates Army-regulated reactor operational at a domestic base by Sept 30, 2028.
2. [Fox Business/The Hill] Army awarded ~$2.2B across 5 bases (Bragg, Campbell, Hood, Benning, Drum) for microreactors, build/operate FY2027–2031.
3. [nuclear-news.net] Fort Bliss reported as flagship site for Pentagon AI data center requiring non-grid power.
4. [morganlewis.com] FY2026 NDAA codifies nuclear deployment executive agent and Navy SMR pilot program.
5. [claude_news] No NRC/DOE authorization or groundbreaking confirmed yet for any reactor explicitly tied to a data center.
# Cross-market signals
- Kalshi related: KXFUSION-30 (nuclear fusion by 2030) trading at 31%, roughly flat — shows market distinguishes fusion hype from fission/military reactor progress.
- Polymarket: No matching markets found.
- Sportsbook implied: N/A (not applicable to this event type).
# Analyst opinions and speculation
- Hogan Lovells: 2028 deployment goal "ambitious," contingent on congressional appropriations unlikely before 2026; legal pathway (DOE alternative authorization vs NRC) unresolved.
- code_execution scenario model: structural probability ~29.5% (base case), driven mainly by uncertainty in whether any reactor effort gets explicitly "data-center" framed rather than whether a reactor program proceeds at all (which is judged 55–85% likely).
# Directional lean per outcome
- **Yes**: Strong structural momentum — EO 14299 deadline (2028, before market close), 5 bases under contract, NDAA statutory backing, explicit EO language tying reactors to AI data centers, Fort Bliss/floating-reactor reports directly merging nuclear+AI-compute themes. Kalshi price rising on this news.
- **No**: Current awarded projects (Janus 5-base program) are framed as general/installation power, not formally "data center" reactors; no NRC/DOE authorization, EIS, or groundbreaking yet exists; funding/regulatory/schedule risk is real; resolution may hinge on strict interpretation requiring explicit reactor-to-data-center pairing, which remains only in early/rumored stage (Fort Bliss, floating reactor).
# Gaps / unknowns
- No official Kalshi resolution criteria/rules text provided — ambiguous whether general installation-power reactors count as "data center" reactors.
- No confirmed NRC/DOE filing or NEPA/EIS action for any base reactor as of latest data.
- Fort Bliss AI data center reactor pairing and floating reactor concept remain reported, not contracted.
# Calibration anchors
- Kalshi current YES price: **54%** (anchor), up from ~46% a month ago on Janus-award news.
- code_execution structural estimate: ~28–30% base case, implying market may be pricing in more certainty on "data-center" framing than warranted.
- Comparable: KXFUSION-30 trading 31% flat — illustrates market discounts speculative tech timelines absent binding deadlines; KXDATACENTER-30 benefits from statutory EO deadline (2028), justifying higher price than fusion.